AHMC SETON MEDICAL CENTER, 1900 Sullivan, Daly City

  • Seton Medical Center came to us with a plan to replace their cardiac catheterization lab system. Thanks to a diligent pre-project analysis with the Stinnett Group and the structural engineer, we saved our client 40% of the projected budget and reduced the anticipated downtime of the Cath lab by four and a half months.

    The team’s analysis showed that while the new Cath lab system was more technologically advanced than the old system, it did not require the costly structural work scoped in Seton's original plans. The new system was lighter and therefore, existing floor anchors could be adapted for re-use. In working with the architect and equipment supplier, we determined the existing C-arm could also be re-used, again eliminating the need for additional structural work.

    Daily project reports by our superintendent kept the key parties informed, ensuring all moving parts were in sync, on time, and accounted for. The end result: predictability and a smoothly run project that exceeded our client’s expectations, greatly reduced the cost of construction and prevented lost revenues thanks to less equipment downtime.

  • Peacock assisted Seton Hospital with some major cost and schedule impacts on their current Seismic Project. We supplanted the previous GC Team on the new Sterile Processing Suite project and saved over $2 million and a year of potential delays.

    Peacock presented Seton with a creative design-build solution that would meet their challenging schedule, save them over $2 Million, and establish CSPD as a permanent fixed asset, not as a temporary service. The solution entailed relocating services into the existing Ambulatory Surgery Center adjacent to the hospital. The design-build team worked with the facility and trade partners to overcome all constraints, while upholding the original contract schedule and budget. The project closed at less than half the cost of previous team’s projected budget. Bigger is not always better. In this case, Peacock Construction’s ability to be nimble, client-focused, and solutions-oriented made all the difference.